KIX 92.1Oldies 98.397.9 The BeatQ-102Delta Country 105.7Star 101KIX 92.7WNIXWNLA AM 1380

Construction Begins on Reed Road in Greenville

SHARE NOW
GREENVILLE, Miss.–If you travel Reed Rd. in Greenville, you can look forward to temporary ramps as a contractor works on the sewer.
A Facebook post from Mayor Errick Simmons says the work is expected to take about six weeks and while Suncoast Infrastructure is working on the sewer line, they have put a temporary bypass in place, which is the reason for the ramps.
The ramps are in the area where Reed Rd. and Main St. intersect.
You’re being asked to slow down and watch out for people working.